Foundation repair and lifting results for commercial projects can vary greatly depending on soil conditions, structural loads, and budget.

Regardless of the size of your project, you can rest assured Power Lift Foundation Systems has the experience, equipment, engineering expertise, and manpower to solve your foundation problem!
On the following pages, you can find out about Power Lift’s services and how we can help you solve your foundation issues:

Read More About:

Foundation Support and Lifting

Underpinning is the process of strengthening and supporting a foundation. With proper design and installation, underpinning can be used to lift structures to an acceptable elevation and provides vertical support to prevent the area from experiencing additional settling.

Read More


Commercial Foundation Repairs

Before you trust your commercial foundation repair needs to just anyone, see the projects below for a sample of what Power Lift can do for you.

Schedule a call with one of our reps and we’ll be happy to discuss any questions you might have.

Commercial Repair Project Summaries

Bossier City Readiness Center

The home offices of the Louisiana National Guard in Bossier City, Louisiana began to show signs of settlement over time. Accordingly, state officials prepared a preliminary plan of repair. Upon work start, Power Lift identified major variations between the perceived foundation construction and the actual foundation construction. Accordingly, Power Lift teamed with Smith Engineering, Inc., of Bossier City, Louisiana, to develop an appropriate repair plan.

View PDF

Butler County Community College

In March of 2008, Power Lift was contacted by college personnel reporting interior distress of the interior slab and interior load bearing walls. The distress observed posed life safety issues such as doors that would not open and close properly and trip hazards in the floor slab. Power Lift’s synchronized lifting system was utilized to simultaneously raise 99 piles that had been installed to support the walls and slab.

View PDF

Eaton Hotel

The wood floor framing system of this historic hotel had settled more than 8.5” over the years. Power Lift worked with Key Construction and the EOR to design and install a new steel support system to carry each floor load. Power Lift’s unified lifting system was used to simultaneously raise new steel basement support columns 6.5” to remedy the existing settlement.

View PDF

Isley Elementary School

Interior foundation walls at this Wichita, KS elementary school had settled over 5” causing life safety concerns due to inoperable doors and excessive floor slopes. Power Lift worked with MKEC Engineering Consultants, Inc. to design an underpinning and lifting system to remedy the problem. Power Lift’s synchronized hydraulic lifting system raised the foundation more than 5”, back to near its original position where it was permanently secured.

View PDF

Mid-Continent Public Library

In the summer of 2006, settlement was observed by library personnel. The settlement intensified into the fall necessitating emergency repairs to halt the ongoing settlement. Power Lift’s piles were driven more than 20’ and founded in the underlying shale stratum to permanently secure the building’s foundation.

View PDF

People’s Bank of Nixa

The building’s ornate entrance began experiencing settlement shortly after construction. Poorly compacted basement backfill was allowing settlement of the shallow entrance foundations. Power Lift worked with Ross Builders, Inc., to develop an underpinning and lifting system to raise and permanently support the structure.

View PDF

Raytown Fire Station

Shortly after removal of underground fuel storage tanks and contaminated soils, the Raytown fire station began to experience excessive foundation settlement along the north wall. Power Lift installed 36 driven steel piles and raised the structure more than 4” to correct the problem.

View PDF

Twin Box Culverts

Power Lift was contacted by the Yantis Company regarding elevating of two newly constructed twin box culverts. It was determined an error had occurred when establishing the benchmark for the subdivision development. One culvert needed to be raised 3’ and the other 3’-6”. Power Lift teamed with the San Antonio, Texas engineering firm of Cutler Gallaway Services, Inc., to develop a unique solution to elevate and salvage these culverts utilizing Power Lift’s synchronized lifting system.

View PDF

United Instruments, Inc.

Poor surface drainage conditions and water infiltration caused excessive settlement of the exterior and interior southwest corner of this two-story office building. Power Lift worked with a local engineer to design an underpinning system to raise and re-support the distressed area of the building. Utilizing Power Lift’s unified, synchronized lifting system, the perimeter and interior foundations and slab were raised back to their original elevation and secured.

View PDF

Ennis Intermediate School

Complete perimeter underpinning of a 4 year old, 45,000 square foot school building requiring nearly 400 piles to depths of 45′.

View PDF

Fairway Apartments

Underpinning of 11 multi-family apartment buildings to stop ongoing settlement. One building required 60 piles to be raised simultaneously

View PDF

Fort Sam Houston

Underpinning the stone foundation of a turn of the 20th century three-story barrack in San Antonio, TX.

View PDF

St. Gobain Containers

Underpinning of a bottling plant furnace mat foundation utilizing 7″ O.D., 320 kip capacity jacked steel piles in Ruston, LA.

View PDF

Porter Business Building-Kilgore Junior College

Underpinning of a concrete framed three-story building utilizing 8 5/8″ O.D., 300 kip capacity helical piles.

View PDF

Kroger #539

Underpinning to stop settlement of a Kroger Signature store in Shreveport, LA using 7″ O.D., 300 kip capacity helical piles to depths of 80′ and raising of the structure more than 8″.

View PDF

McAdoo Hotel

Underpinning and raising of a historic three-story building in Shreveport, LA utilizing 4 ½” O.D.,180 kip capacity helical piles to depths of more than 50′.

View PDF

Santa Fe Ranch Luxury Apartments

Installation of 100 kip capacity jacked piles to depths of 45′ installed through an excavated area below slab to allow lowering of a 5 year old, 8,000 square foot structure to address heave issues.

View PDF

Texas A&M Building #457

Underpinning of a concrete framed three-story building built in 1934 requiring new collars cast around the original foundation columns utilizing jacked piles with 100 kip capacity to depths of approx 35′.

View PDF

Load Testing Program

Testing of Power Lift piles per ASTM D-1143.